Boiler feed pumps start up checks
Boiler feed pumps start up checks

Boiler feed pump pre-start up checks

Boiler Feed Pump (BFP) is one of the most critical auxiliaries in any thermal power plant or process industry boiler system. It ensures continuous supply of feed water to the boiler at the required pressure and flow. Any failure or improper start-up of the BFP can lead to boiler trip, tube damage, overheating, or even catastrophic failure.

In high-pressure systems, especially in plants designed as per Indian Boiler Regulations (IBR), strict start-up procedures are essential to ensure safety, reliability, and long equipment life.

As per standard, a single or running Boiler feed pump capacity (excluding stand by) should be 135% of Boiler MCR.

Boiler feed pump is the heart of Boiler as;

  • It supplies feed water to the Boiler for steam generation
  • It operates under high pressure and temperature
  • It operates continuously at high rotational speed
  • It ensures Boiler safety
  • It supports load changes in Boiler

As Boiler feed pump is a critical and heart of the Boiler, start up of this equipment needs more attention. If not followed results into following incidents;

  • Cavitation
  • Bearing failure
  • Mechanical seal failure
  • Pump and motor over loading
  • Gasket and welding joints failure
  • Personal safety
  • Reverse rotation etc

Structured start up of pump leads to;

  • Equipment safety
  • Personal safety
  • Energy saving
  • Reliable Boiler operation
  • Reduced down time
SL No.ChecksNormal vaue/statusActual value/statusRemarks
1Maintenance activities on pumpsCompleted  
2Pump normalisedYes  
3Pump suction valveOpen  
4Pump discharge valveClose  
5Pump recirculation line isolation valveOpen
6Bearing oil level50+%  
7Pump Bearing temperaturesNormal or < 50 deg c  
8Motor bearing temperaturesNormal or < 50 deg c  
9Bearing cooling water line valvesOpen  
10Suction pressure+1.2 Kg/cm2  
11Suction TemperatureAtmospheric or as per design Should be more than deaerator operating temperature
12Balance leak off line valveOpen  
13All transmitters lines isolation valvesOpen  
14Coupling and shaftFree to rotate  
15Coupling guardsFixed  
16Any looseness in pumps and motorsNo  
17Pump and motors are cleanClean  
18Deaeartor level65 to 75%  
19Mechanical seal leakageNo leakage  
20Mechanical seal cooling line valveOpen  